OUR Douglas Contract Opportunity 5

Opening Up the River Douglas – Contract Opportunity OURD05

Contract Opportunity Opened – 15th October 2020

The Opening Up the River Douglas programme (OUR Douglas), funded by the European Regional Development Fund (ERDF), aims to specifically address and improve fish passage in the Douglas Catchment, creating a fish easement which allows for the passage of all fish species at all times.  As such the project is advertising this contract opportunity for the construction of a embedded rock ramp fish pass at the weir near Red Rock. 

Although these works are below the thresholds for a full procurement procedure under the Public Contracts Regulations 2015 –RRT is still under and obligation to ensure compliance with EU principles of transparency, equality and non-discrimination, as such RRT is conducting a formal tender process in which all bidders will be treated equally, with no discrimination and through a transparent process.

Set out below are the Tender Documents:

Reference Document
OURD-RRW01 Invitation to Tender
OURD-RRW02 NEC
OURD-RRW03 Design Plan A
OURD-RRW05 Design Section A
OURD-RRW07 Method of Works
OURD-RRW08 Environmental Risk Assessment
OURD-RRW10 Environment Impact Assessment
OURD-RRW11 Invasive Non-Natives Species Method Statement
OURD-RRW12 Site Photos
OURD-RRW13 Design Phase Risk Assessment
OURD-RRW14 Pre-Construction Information
OURD-RRW15 Site Access Map
OURD-RRW16 Site Location Map
OURD-RRW18 Local Condition Form
OURD-RRW19 Tender Return Assessment Matrix
OURD-RRW20 Gas Service Check
OURD-RRW21 Water Service Check
OURD-RRW22 BT Service Check
OURD-RRW23 Electricity Service 
OURD-RRW36 Flood Risk Assessment Spec
OURD-RRW37 Interpretation Board Spec